TM-9-2815-225-34-P

ENGINE, DIESEL: 6 CYLINDER IN-LINE TURBOCHARGED, CUMMINS MODEL NTC-400

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2005

  TM-9-2815-225-34-P - Page 470 of 736

TM 9-2815-225-34&P
0049 00
0049 00-8
BIG CAM I ENGINE INSTALLATION (Contd)
41.
Position heater tube (11) and secure to fitting (13) using flare nut (12). Do not tighten flare
nut (12).
42.
Connect heater hose (4) to heater tube (11) and secure using clamp (6).
43.
Connect heater hose (5) to heater tube (9) and secure using clamp (6).
44.
Connect heater hose (15) to heater valve (14) and secure using clamp (6).
45.
Secure heater hose (4), heater hose (5), bracket (8), bracket (10), and battery cable terminal (7) in
three places using clamps (2) bolts (3) and nuts (1).
46.
Tighten flare nut (12) to fitting (13).
Figure 10. Heater Hose Installation.
~
12
11
2
3
1
13
10
2
1
6
9
3
2
1
3
7
8
4
5
6


Back to Top