MWO-5-2350-262-35-4

ARMORED COMBAT EARTHMOVER (ACE), M9

MODIFICATION WORK ORDER

  MWO-5-2350-262-35-4 - Page 64 of 207

MWO 5--2350--262--35--4
3--35
SECTION II INSTALLATION OF HDC PRIMARY MANIFOLD ASSEMBLY,
MANUAL SHUT–OFF VALVE V23, AND LEFT MAIN MANIFOLD PRESSURE
TRANSDUCER T7 -- CONTINUED
3--6
MOUNTING OF DIRECTIONAL CONTROL VALVE (DCV) BANK AND SUSPENSION
VALVE
WARNING
The DCV bank weighs approximately 60 pounds. It is necessary to fully support the
weight of the directional control valve bank when securing the bank to the weldment
bracket. Failure to do so could result in serious personal injury.
NOTE
Steps a though c below apply to Figure 3--21.
a.
Fully supporting entire weight of DCV bank, place hose (1), o--ring, MS28775--219, (5), (hidden inside
pipe flange) and split pipe flange (3) in position on back of DCV bank (4).
b.
Install split pipe flange (3) around hose (1) and o--ring (5) with four locking screws, B1821BH038C125L,
(2) and four saved flat washers (7) on rear of DCV bank.
c.
Continuing to support weight of DCV bank, connect second hose (6) to same area on back of DCV bank
(4).
Figure 3--21. DCV Bank Mounting Connections