TB-9-2350-277-40-P-4

CARRIER, COMMAND POST, FULL-TRACKED, ARMORED, M577A3; STANDARD INTEGRATED COMMAND POST SYSTEM (SICPS), M1068A3

TECHNICAL BULLETIN; INSTALLATION OF CREW II MODIFICATION KIT PART 4 OF 4

JUNE 2009

  TB-9-2350-277-40-P-4 - Page 47 of 100

TB 9-2350-277-40&P-4
INSTALLATION PROCEDURES – Continued
0005 00
0005 00-11
WARNING
Hanging loads, heavy parts, and overhead equipment can fall
unexpectedly.
Falling loads can kill or seriously injure personnel.
Keep away from hanging loads, heavy parts, and overhead
equipment.
Use correct lifting devices to move hanging loads and
heavy parts.
Always have a helper guide you.
Keep your hands and
feet out of confined spaces from which heavy loads are being
installed or removed.
11. Attach an endless sling (31) to primary unit enclosure assembly (30) lifting eye.
Attach sling to
lifting device of at least 300 lbs capacity.
12. Position primary unit enclosure assembly (30) on rear of vehicle with the open end of the
enclosure facing the front of the vehicle.
Have helper assist.
13. Secure primary unit enclosure assembly (30) to vehicle hull with four screws (32) and flat
washers (33).
TORQUE SCREWS TO 105 LB-FT (142.4 N
·
m).
Figure 10.
Primary Unit Enclosure Assembly Installation


Back to Top