TB-9-2350-277-40-P-4

CARRIER, COMMAND POST, FULL-TRACKED, ARMORED, M577A3; STANDARD INTEGRATED COMMAND POST SYSTEM (SICPS), M1068A3

TECHNICAL BULLETIN; INSTALLATION OF CREW II MODIFICATION KIT PART 4 OF 4

JUNE 2009

  TB-9-2350-277-40-P-4 - Page 48 of 100

TB 9-2350-277-40&P-4
INSTALLATION PROCEDURES – Continued
0005 00
0005 00-12
14. Remove endless sling (31) from primary unit enclosure assembly (30) lifting eye.
15. Place cables and ground strap inside primary unit enclosure assembly (30).
16. Secure GPS cable, RCU cable, and power harness to primary unit mounting bracket (34) with tie
straps (16).
17. Install enclosure cover (35) on primary unit enclosure assembly (30).
Secure with four screws
(36) and flat washers (33).
TORQUE SCREWS TO 105 LB-FT (142.4 N
·
m).
Figure 11.
Primary Unit Enclosure Cover Installation


Back to Top