TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 498 of 704

TB 9-3950-253-13&P
Change 1
0051-12
0051
HEMTT REMOVAL – CONTINUED
Reposition Hydraulic Control Box – Continued
00051
27. Remove four bolts (Figure 10, Item 3) and nuts (Figure 10, Item 4) from hydraulic control box (Figure 10,
Item 1). Set aside for reinstallation.
28. Attach sling and lifting device to hydraulic control box (Figure 10, Item 1).
29. Use lifting device to remove hydraulic control box (Figure 10, Item 1) from support brackets (Figure 10, Item 2)
and temporarily position out of way.
Figure 10.
HEMTT Hydraulic Control Box Removal.
051
467-100
1
2
3,4


Back to Top