TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 499 of 704

0051-13
Change 1
TB 9-3950-253-13&P
0051
HEMTT REMOVAL – CONTINUED
Reposition Hydraulic Control Box – Continued
00051
30. Install two new brackets (Figure 11, Item 2), four bolts (Figure 11, Item 4), washers (Figure 11, Item 5), washers
(Figure 11, Item 6), and locknuts (Figure 11, Item 7) on support brackets (Figure 11, Item 3).
NOTE
Use original bolts and nuts when reinstalling hydraulic control box on new brackets.
31. Use lifting device to position hydraulic control box (Figure 11, Item 1) on new brackets (Figure 11, Item 2) and
secure with four bolts (Figure 11, Item 9), and nuts (Figure 11, Item 8).
Figure 11.
HEMTT Hydraulic Control Box Reinstallation.
051
467-101
2
3
4,5,6,7
8,9
2
3
4,5,6,7
1


Back to Top