TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 501 of 704

0051-15
Change 1
TB 9-3950-253-13&P
0051
HEMTT REMOVAL – CONTINUED
Cable Clamp and Bolt Removal
00051
1. Remove two bolts (Figure 13,
Item
2), nuts (Figure 13,
Item
3), and cable clamps (Figure 13,
Item
1) from right
and left side frame (Figure 13,
Item
4). Set aside for reinstallation.
Figure 13.
Cable Clamp Removal.
051
2. Remove two bolts (Figure 14, Item 2) and nuts (Figure 14, Item 3) from right side frame (Figure 14, Item 4)
behind battery box (Figure 14, Item 1). Set aside for reinstallation.
Figure 14.
Bolt Removal.
051
END OF TASK
1
2,3
4
1
2,3
4


Back to Top