TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 536 of 704

TB 9-3950-253-13&P
Change 1
0052-26
0052
PLS STOWAGE ASSEMBLY INSTALLATION – CONTINUED
WARNING
Lifting cables, chains, hooks, and slings used for lifting must be in good condition and of
suitable capacity.
Improper use of lifting equipment and improper attachment of cables may cause injury to
personnel and damage to equipment. Observe all standard rules of safety.
Use extreme caution when handling heavy parts. Provide adequate support and use
assistance during procedure. Ensure any lifting device used is in good condition and of
suitable load capacity. Keep clear of heavy parts supported only by lifting device.
Failure to follow these warnings may result in injury or death to personnel.
NOTE
Stowage assembly weighs 640 lb (290 kg).
8. Attach sling (Figure 24, Item 1) and lifting device to stowage assembly (Figure 24, Item 2).
Figure 24.
Sling on Stowage Assembly
052
1
2


Back to Top