TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 530 of 704

TB 9-3950-253-13&P
Change 1
0052-20
0052
HEMTT STOWAGE ASSEMBLY INSTALLATION – CONTINUED
58. Attach sling and lifting device to stowage box (Figure 19, Item 7).
59. Use lifting device to position stowage box (Figure 19, Item 7) on frame (Figure 19, Item 8).
60. Install four bolts (Figure 19, Item 1), and nuts (Figure 19, Item 2), securing stowage box (Figure 19, Item 7) to
frame (Figure 19, Item 8).
61. Install washer (Figure 19, Item 5), bolt (Figure 19, Item 4) and nut (Figure 19, Item 6) securing mudflap (Figure
19, Item 3) to stowage box (Figure 19, Item 7).
Figure 19.
Stowage Box Installation.
052
1
2
3
4
5
6
7
8


Back to Top