TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 531 of 704

0052-21
Change 1
TB 9-3950-253-13&P
0052
HEMTT STOWAGE ASSEMBLY INSTALLATION – CONTINUED
62. Remove two nuts (Figure 20, Item 1) washers (Figure 20, Item 2), washers (Figure 20, item 3), and bolts
(Figure 20, Item 4) from hydraulic control mounting bracket (Figure 20, Item 5).
63. Install control panel (Figure 20, Item 8), and four bolts (Figure 20, Item 6) on stowage control panel bracket
(Figure 20, Item 7).
64. Install stowage control panel bracket (Figure 20, Item 7), two washers (Figure 20, Item 3), bolts (Figure 20,
item 4), washers (Figure 20, Item 2), and nuts (Figure 20, Item 1) on hydraulic control mounting bracket
(Figure 20, item 5).
Figure 20.
Control Panel Installation.
052
END OF TASK
1,2,3,4
6
7
8
1,2,3,4
5


Back to Top