TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 62 of 704

TB 9-3950-253-13&P
Change 1
0007-16
0007
PLACE LIFT FRAME ON GROUND – CONTINUED
Figure 19.
Bail Bar Lock on Hook.
07
11. Install bail bar lock (Figure 20, Item 4), and locking bar (Figure 20, Item 3) on lift frame (Figure 20, Item 1).
12. Install snap pin (Figure 20, Item 2) in locking bar (Figure 20, Item 3).
Figure 20.
Bail Bar Stowed on Lift Frame.
07


Back to Top