INSTALLATION
1.
Align stone shield (Figure 2, Item 9) with holes in frame rail (Figure 2, Item 6) and splash shield
(Figure
2,
Item
3).
2.
Install stone shield (Figure 2, Item 9) and air check valve (Figure 2, Item 7) on splash shield (Figure 2, Item 3)
and frame rail (Figure 2, Item 6) with lockwasher (Figure 2, Item 1), three screws (Figure 2, Item 8), washer
(Figure 2, Item 5), and two locknuts (Figure 2, Item 4).
M5053DAA
8
4
5
4
3
2
1
9
8
7
6
Figure 2.
Steering Gear Stone Shield Installation.
END OF TASK