INSTALLATION - Continued
2.
Install left 3-phase receptacle wiring harness (Figure 17, Item 8) and three wires (Figure 17, Item 6) in load
center (Figure 17, Item 3) and on triple circuit breaker (Figure 17, Item 4) with three screws
(Figure
17,
Item
5).
3.
Install wire (Figure 17, Item 1) on neutral buss bar (Figure 17, Item 2) with screw (Figure 17, Item 7).
M3066DAA
2
3
4
5
6
7
8
1
Figure 17.
Load Center Box.
TM 9-2320-272-23-4
0639
0639-21