INSTALLATION - Continued
11.
Install five wires (Figure 21, Item 6) and converter wiring harness (Figure 21, Item 7) on circuit breakers
(Figure
21,
Item
3) in load center (Figure 21, Item 2) with five screws (Figure 21, Item 5). Route auxiliary
pump wiring harness (Figure 21, Item 1) through coupling (Figure 21, Item 4).
M3068DAA
7
2
3
4
5
6
1
Figure 21.
Load Center Box.
TM 9-2320-272-23-4
0639
0639-25