INSTALLATION - Continued
20.
Position left main wiring harness (Figure 27, Item 1) on load center (Figure 27, Item 3).
21.
Install two wires (Figure 27, Item 13) on circuit breaker (Figure 27, Item 5) with screw (Figure 27, Item 10).
22.
Install two wires (Figure 27, Item 12) on circuit breaker (Figure 27, Item 6) with screw (Figure 27, Item 9).
23.
Install wire (Figure 27, Item 11) on circuit breaker (Figure 27, Item 7) with screw (Figure 27, Item 8).
24.
Install wire (Figure 27, Item 15) on neutral buss bar (Figure 27, Item 4) with screw (Figure 27, Item 14).
25.
Install three wires (Figure 27, Item 17) on relay (Figure 27, Item 2) with three screws (Figure 27, Item 16).
M10300DAA
6
5
7
4
2
3
17
1
16
15
14
13
12
11
10
9
8
Figure 27.
Load Center Box.
TM 9-2320-272-23-4
0639
0639-31