TM-9-2320-272-23-4

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; FIELD MAINTENANCE MANUAL; VOLUME 4 OF 5

SEPTEMBER 2012

  TM-9-2320-272-23-4 - Page 513 of 1393

INSTALLATION - Continued
4.
Install right 3-phase receptacle wiring harness (Figure 18, Item 8) and three wires (Figure 18, Item 6) in load
center (Figure 18, Item 3) and on three circuit breakers (Figure 18, Item 4) with three screws
(Figure 18, Item 5).
5.
Install wire (Figure 18, Item 1) on neutral buss bar (Figure 18, Item 2) with screw (Figure 18, Item 7).
M10295DAA
7
8
1
6
5
4
3
2
Figure 18.
Load Center Box.
TM 9-2320-272-23-4
0639
0639-22


Back to Top