INSTALLATION - Continued
12.
Install wires (Figure 22, Items 1 and 9) on connectors (Figure 22, Items 2 and 6) (TM 9-237).
NOTE
Apply sealing compound before performing Step (13).
13.
Install cover (Figure 22, Item 7) on junction box (Figure 22, Item 8) with eight screws (Figure 22, Item 5).
14.
Connect cables (Figure 22, Items 3 and 4) to connectors (Figure 22, Items 2 and 6).