INSTALLATION - Continued
17.
Install three wires (Figure 25, Item 9) and air conditioner wiring harness (Figure 25, Item 10) in load center
(Figure 25, Item 6) and on circuit breaker (Figure 25, Item 7) with three screws (Figure 25, Item 8).
18.
Install cable assembly (Figure 25, Item 3), ground cable (Figure 25, Item 2), and cable (Figure 25, Item 9) on
load center (Figure 25, Item 6) with screw (Figure 25, Item 5), washers (Figure 25, Items 4 and 12), and nut
(Figure 25, Item 1).
M10299DAA
7
6
5
4
3
2
1
12
11
10
9
8
Figure 25.
Load Center Box.
TM 9-2320-272-23-4
0639
0639-29