INSTALLATION - Continued
15.
Install wires (Figure 23, Items 6 and 7) and right 10 kW electric heater wiring harness (Figure 23, Item 1) on
circuit breaker (Figure 23, Item 3) in load center (Figure 23, Item 4) and neutral buss bar
(Figure 23, Item 2) with screws (Figure 23, Items 5 and 8).
M10298DAA
1
8
7
6
5
4
3
2
Figure 23.
Load Center Box.
TM 9-2320-272-23-4
0639
0639-27