TM9-2320-273-34
TA 074046
Figure 5-54. Solenoid Switch Test Setup.
NOTE
Do not adjust the switch while it is
energized for longer than 30 seconds.
(5) With the switch energized, check the spacing between the face of the pinion and the thrust
washer, using a 0.187-in. thick gage (fig. 5-55). The final adjustment is made by turning the socket clock-
wise or counterclockwise until the 0.187-in, gage just fits between the pinion and the thrust washer.
TA 074047
Figure 5-55. Switch Adjustment Check.
5-14. Switch Timing Test.
a. Use the same battery and switch setup as in fig. 5-54.
b.
Connect an ohmmeter, as a light in series with a battery, across switch terminal Nos. 2 and 3
(large studs).
.
c. Insert a 0.812-in. gage between the pinion face and the thrust washer.
d. Energize the switch and check for continuity. If continuity is present when the gage is inserted,
replace the switch plunger and shaft assembly or the entire solenoid switch.
e. Replace the rubber plug in the end of the switch terminal housing.
5-42