TM-9-2330-202-13-P

TRAILER, CARGO, 3/4-TON, 2-WHEEL: M101A1, M101A2 AND M101A3; TRAILER, CHASSIS, 3/4-TON, 2-WHEEL: M116A1 AND M116A2; TRAILER, CHASSIS, 1-TON, 2-WHEEL: M116A3

TECHNICAL MANUAL; OPERATOR AND FIELD MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST

DECEMBER 2011

  TM-9-2330-202-13-P - Page 227 of 552

INSTALLATION
1.
Install backing plate (Figure 4, Item 3), five cap screws (Figure 4, Item 6), and nuts (Figure 4, Item 4) on axle
(Figure 4, Item 5).
2.
Route swaged sleeve (Figure 4, Item 2) through backing plate (Figure 4, Item 3).
3.
Pull spring away from swaged sleeve (Figure 4, Item 2) and hook swaged sleeve (Figure 4, Item 2) on parking
brake lever (Figure 4, Item 1).
1
2
2
4
6
3
5
1
M116_M101_083
Figure 4.
Service Brake Installation.
END OF TASK
FOLLOW ON TASK
1.
Install hub and brake drum (WP
0055).
2.
Adjust service brakes (WP
0048).
3.
Adjust handbrakes (WP
0043).
END OF TASK
END OF WORK PACKAGE
TM 9-2330-202-13&P
0046
0046-7/8 blank


Back to Top