TM-9-2350-256-10

RECOVERY VEHICLE, FULL TRACKED: MEDIUM, M88A1

OPERATOR'S MANUAL

OCTOBER 2014

  TM-9-2350-256-10 - Page 540 of 796

Table 1.
Operator Preventive Maintenance Checks and Services (PMCS) – After - Continued.
ITEM
NO.
INTERVAL
ITEM TO BE
CHECKED OR
SERVICED
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE IF:
2
AFTER
Boom
NOTE
Boom can be left in RAISE position for
engine compartment and transmission oil
level checks in PMCS.
1. Check boom operation (WP 0078).
Boom will not raise or
lower.
2. Check for leaks, ruptures, and other damage.
3
AFTER
Hoist Winch
1. Check hoist winch operation (WP 0079).
Hoist winch inoperative.
NOTE
Cables are considered unserviceable when
three wires are broken per strand or six
wires per lay.
2. Clean and lube cable (WP 0101).
3. Check cable for damage.
Cable is damaged.
4. Ensure cable is wrapped properly on winch drum.
4
AFTER
Main Winch
CAUTION
Payout winch cable slowly. Fast initial
payout can cause cable to unspool. Failure
to comply may cause damage to equipment.
NOTE
Cables are considered
unserviceable when three wires are
broken per strand or six wires per
lay.
If main winch was used, perform
the following steps.
1. Clean and lube cable (WP 0101).
2. Check cable for damage.
Cable is damaged.
5
AFTER
Spade and
Spade Lock
1. Raise and lower spade (WP 0075).
Spade will not raise or
lower.
2. Lock spade in UP position (WP 0075).
Spade will not lock in UP
position.
6
AFTER
Fuel Level
Check fuel level gauge with FUEL TANK switch in
FRONT and REAR positions. FRONT and REAR fuel
levels should be similar.
TM 9-2350-256-10
0098
0098-2