TM 9-2350-260-20-1-2
POWERPLANT REPLACEMENT (2A ENGINE) (Sheet 11 of 24)
40.
Using 1-1/2 inch socket, loosen two screws (AT) at
transmission mounts (both sides).
TRANSMISSION MOUNT
41.
Remove two screws (AT), lockwashers (AU),
recessed washers (AV), and washers (AW)
securing two mounting brackets to transmission
mounts.
Throw lockwasher away.
42.
Check all disconnected rod and line ends to make
sure they are out of way during powerplant
removal.
43.
Connect hoist hook to sling.
Make sure hoist hook
is put through indicated hole of sling.
Go on to Sheet 12
TA147913
5-12