TM 9-2350-260-20-1-2
POWERPLANT REPLACEMENT (2A ENGINE) (Sheet 14 of 24)
6.
Using hoist, pick up sling and install four sling
hooks through four lifting eyes on powerplant.
7.
Make sure sling cables hang naturally; don't twist
them when inserting hook ends.
WARNING
Be careful when lifting powerplant.
Serious injury to personnel can result
from careless handling.
Also, power-
plant can be damaged if bumped
against hull.
8.
Make sure turret is turned so gun tube is pointing
directly to side.
Make sure turret clears grille
doors.
4.
Position six spring washers (B) (three on each
side) on top of transmission mounts in engine
compartment (late model M60 only).
NOTE
T-end of sling should be toward front
(engine end of powerplant).
5.
Make sure hoist hook is in powerplant hole of sling
(Item 33, Chapter 3, Section ).
Go on to Sheet 15