TM 9-2350-260-20-1-2
POWERPLANT REPLACEMENT (2A ENGINE) (Sheet 18 of 24)
28.
Position shifting linkage with the two flat sides of
rods together.
29.
Install screw (N).
Using 7/16 inch socket, tighten screw.
30.
Using pliers, install new lockwire (P) (Item 60, Appendix D) through screw (N) and around shifting linkage.
NOTE
Check assembled shifting linkage rods.
Clearance should be at least 1/4 inch
between rods and turbocharger.
31.
Position two rods of steering linkage with two flat sides of rods together.
Using 7/16 inch wrench, install screw (Q).
32.
Using pliers, install new lockwire (R) through screw (Q) and around steering linkage.
Go on to Sheet 19
TA147920
5-19