TM 9-2350-260-20-1-3
SHIFTING CONTROL BASE ASSEMBLY REPAIR AND REPLACEMENT (Sheet 6 of 6)
16. Position rod end (X) onto quadrant link (Q).
Install
pin (Y) through rod end (X) and quadrant link (Q)
and, using pliers, install new cotter pin (Z) through
pin (Y).
17. Install cam assembly (page 11-31).
18. Install bracket assembly (page 11-35).
19. Install shifting control connecting link (page 11-33).
20. Install accelerator foot pedal lock assembly (page 7-389).
21. Adjust shifting linkage (page 11-2).
End of Task
TA146584
11-30