TM 9-2350-260-20-1-3
FINAL DRIVE (LEFT AND RIGHT) REPLACEMENT (Sheet 1 of 4)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
12-3
Installation
12-4
TOOLS:
Hoist (capable of 1100 lb minimum capacity)
Pinch bar
Socket wrench handle with 3/4 in. drive
1-1/2 in. socket with 3/4 in. drive
Torque wrench with 3/4 in. drive (0-600 ft)(0-813 Nm)
1-1/2 in. hand impact wrench offset link with 3/4 in.
drive
36 in. extension bar (cheater bar)
SUPPLIES:
Sealing compound (Item 27, Appendix D)
Oil (Item 44, Appendix D)
1-1/2 in.
locknuts (10870133)
Small brush (Item 10, Appendix D)
PERSONNEL: Two
REFERENCES:TM 9-2350-260-10
LO 9-2350-260-12
PRELIMINARY PROCEDURES:Remove powerplant (page 5-1)
Remove rear powerplant guide (page 6-4)
Remove adapter assembly (page 12-9)
Remove rear fender handset box (right side only)
(page 16-193)
Remove sprocket assembly (page 14-73)
Drain oil from final drive (LO
9-2350-260-12)
Remove rear outrigger (page 16-77)
Go on to Sheet 2
TA146633
12-2