TM 9-2350-261-20-2
REPLACE MASTER SWITCH PANEL ASSEMBLY (LATE SLAVE RECEPTACLE)
(ALL EXCEPT M577A2 AND M1068) — Continued
0222 00
6.
Install new grommet (1) on ground lead (2). Route ground lead into master switch panel (3) and secure grommet.
7.
Install ground lead (2) on negative post (4) of auxiliary power receptacle (5). Secure with screw (6) and new lockwasher
(7).
8.
Install master switch panel (3) on distribution box (8). Secure with eight screws (9), washers (10), and new locknuts (11).
9.
Connect circuit 37 lead (12) to connector (13).
022200-5