TM 9-2350-261-20-2
REPLACE MASTER SWITCH PANEL ASSEMBLY (EARLY SLAVE RECEPTACLE)
(ALL EXCEPT M577A2) — Continued
0223 00
INSTALLATION
1.
Install two new grommets (17) in master switch panel assembly (16).
2.
Install circuit 49 lead (8) and circuit 6 lead (4) through two grommets (17) into master switch panel (16).
NOTE
For all carriers with 200 amp generator, do Step 3.
3.
Install circuit 2A lead (14) on master switch terminal (15). Secure with new lockwasher (13) and nut (12).
4.
Install circuit 6 lead (8), circuit 2 lead (9), and circuit 400 lead (10) on bus bar (11). Secure with screw (7) and new
locknut (6).
5.
Install circuit 49 lead (4) on auxiliary power receptacle lead (5). Secure with screw (2), nut (1), and two new lockwashers
(3).
NOTE
Check gasket on master switch panel flange for cracks or other damage. Replace gasket
if damaged.
6.
Install master switch panel (1) on distribution box (2). Secure with eight screws (3), washers (4), and new locknuts (5).
022300-3