TM-9-2350-261-20-2

CARRIER, M113A2, M577A2, M1064, M1068, M1059 AND M901A1

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL - VOLUME 2 OF 4

  TM-9-2350-261-20-2 - Page 136 of 1008

TM 9-2350-261-20-2
REPLACE MASTER SWITCH PANEL ASSEMBLY (EARLY SLAVE RECEPTACLE)
(ALL EXCEPT M577A2) — Continued
0223 00
7.
Install ground lead (6) on instrument panel strut (7). Secure with screw (8), new locknut (9), and washer (10).
8.
Connect circuit 37 lead (11) to connector (12).
FOLLOW-THROUGH STEPS
1.
Connect battery ground lead (WP 0294 00).
2.
Connect infrared power supply cable (WP 0291 00).
3.
Start engine (see your -10). Check that master switch panel assembly works properly.
4.
Stop/shutdown engine (see your -10).
END OF TASK
0223 00-4


Back to Top