TM 9-2815-205-34
2-31. ENGINE FROM/TO CONTAINER (MODELS 5063-5299,5063-5392, 5063-5393 AND
5063-539L)
This task covers: a. Removal
b. Installation
INITIAL SETUP
MODELS
5063-5299 5063-5392 5063-5393 5063-539L
TOOLS AND SPECIAL TOOLS
Tool set, general mechanics (App B, Item 107)
Sling, beam-type (App B, Item 92 )
Wrench, torque (App B, Item 116)
MATERIALS/PARTS
4
Lockwashers (App F, Item 101)
EQUIPMENT CONDITION
Para Description
2-3 Container top removed.
PERSONNEL REQUIRED: 2
a. Removal
(1)
(2)
(3)
(4)
Attach beam-type sling (1) to lifting
brackets (2) and support engine with lifting
Remove two screws (3), two nuts (4), two
lockwashers (5), and four flat washers (6)
connecting trunnion assembly 7) to
forward container support (8). Store
screws, washers, and nuts in mailbag (9)
in lower half of container (10).
Remove four screws (11), four nuts (12),
four lockwashers (13), and four flat
washers (14), connecting rear support (15)
to two container mounting brackets (16).
Discard lockwashers.
Never crawl under equipment
when performing mainte-
nance unless equipment is
securely blocked. Keep clear
of equipment when it is being
raised or lowered. Do not al-
low heavy components to
swing while suspended by
lifting device. Exercise cau-
tion when working near a ca-
ble or a chain under tension.
Equipment may drop or shift
and injury to personnel may
result.
Remove engine from lower half of
container (10).
2-80
Change 1