MWO-5-2350-262-35-4

ARMORED COMBAT EARTHMOVER (ACE), M9

MODIFICATION WORK ORDER

  MWO-5-2350-262-35-4 - Page 142 of 207

MWO 5--2350--262--35--4
5--7
SECTION II INSTALLATION AND PRELIMINARY ROUTING OF HDC CABLE
ASSEMBLIES -- CONTINUED
NOTE
Step q below applies to Figure 5--4.
q.
Route branches of upper cable assembly W2 (3) from access cover opening down into bowl area near
left side of DCV bank and primary manifold, as shown in Figure 5--4. Callouts 1, 2, 3 and 5 identify final
placement of different portions of cable assembly W2 when it is installed. Callout 4 shows the initial
placement of lower cable assembly W3 in bowl area relative to upper cable assembly W2.
Figure 5--4. Placement of Upper Cable Assembly W2
NOTE
Upper cable assembly W2 electrical connections are not made at this time. Upper cable
assembly W2 connections to HDC solenoid valves and pressure transducers are
performed in Section V.