TB-9-2320-280-35-15

TECHNICAL BULLETIN

INSTALLATION INSTRUCTIONS FOR RETRANSMISSION VEHICLE WITH AMTECH TOP FOR AN/VRC-92F, AN/UYK-128 (V)4, RT-1812, AN/VSQ-2 (V), AB-1386/U, DAGR, AN/PSN-11

SEPTEMBER 2006

  TB-9-2320-280-35-15 - Page 106 of 168

5-82
TB 9-2320-280-35-15
35-8.
Route antenna cable (1) behind heater shield (11) to installation mount (12).
35-9.
Locate, mark, and drill one 0.147-in. diameter hole (15) in plenum (8).
35-10.
Secure antenna cable (1) to plenum (8) with clamp (10) and self-tapping screw (9).
35-11.
Secure excess antenna cable (1) behind installation mount (12) on integrated radio rack (14) with
tiedown strap (13).
12
13
14
8
9
10
1
11
~
~
9. SELF-TAPPING SCREW – 9416639 – QTY. 1
10. CLAMP – MS21333-67 – QTY. 1
13. TIEDOWN STRAP – MS3367-1-0 – QTY. 1
Figure 5-96.
8
15
~
18.50
0.75
M998A2 SERIES
Figure 5-97.
Figure 5-98.
8
15
~
17.25
0.75
M998 SERIES
M998A1 SERIES


Back to Top