TM 9–1200–215–34&P
4–1
CHAPTER 4.
DIRECT SUPPORT MAINTENANCE INSTRUCTIONS FOR
PROGNOSTIC/DIAGNOSTIC INTERFACE UNIT (PDIU)
Section
I – REP
AIR P
ARTS, T
OOLS, SPECIAL T
OOLS, TEST
,
MEASUREMENT
, AND DIAGNOSTIC EQUIPMENT (TMDE), AND
SUPPORT EQUIPMENT
.
Page
Page
Common Tools and Equipment
4–1
. . . . . . . . . . . . . .
Special Tools, TMDE, and Support Equipment
4–1
.
Repair Parts
4–1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4–1.
COMMON TOOLS AND EQUIPMENT
For authorized common tools and equipment, refer to the Modified Table of Organization and Equipment (MTOE),
CTA 50–970, or CTA 8–100, as applicable to your unit.
4–2.
SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT
Refer to Appendix C, Repair Parts and Special Tools List (RPSTL) for applicable special tools, TMDE, and
support equipment.
4–3.
REPAIR PARTS
Refer to Appendix F of this manual for a list of mandatory replacement parts.
Repair parts are listed and
illustrated in Appendix C of this manual.
Section
II – SER
VICE UPON RECEIPT
.
Page
Page
Site and Shelter Requirements
4–1
. . . . . . . . . . . . . .
Service Upon Receipt
4–1
. . . . . . . . . . . . . . . . . . . . . .
4–4.
SITE AND SHELTER REQUIREMENTS
PDIU DS maintenance will be performed using the facilities contained within the Electronic Shop, Transportable,
AN/TSM–191(V)3.
4–5.
SERVICE UPON RECEIPT OF MATERIEL
a.
Unpacking.
(1)
Place packed PDIU on a work bench.
(2)
Check the condition of the packaged PDIU.
Check the markings.
Note discrepancies.
(3)
Do not use sharp blades or sharp cutting tools when unpacking the PDIU.
Remove packing material
carefully.