TM 9–1200–215–34&P
2–13
2–13.
TOP PANEL MAINTENANCE INSTRUCTIONS CONTINUED
b.
INSTALLATION CONTINUED
3.
Place top panel (1) into position and align
holes.
NOTE
When torquing screws on top panel,
sequence numbers 22, 14, and 16
require a 20 in.–lb (2.3 N
S
m) torque.
4.
Insert 21 shorter screws (2), 3 longer screws
(6), and 24 flat washers (3).
Following torque
sequence chart below, torque screws to 30
in.–lb (3.4 N
S
m).
11
7
21
15
1
13
9
10
22
14
16
2
8
12
24
18
4
20
6
23
17
3
19
5
3
2
1
3
6