TM 9-2320-283-13&P
0033
0033-7
INSTALLATION – CONTINUED
1
2
3
4
5
6
7
8
9
10
~
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Figure 10. Installing Circuit Breaker Panel.
NOTE
Wire connectors shall be crimped and heat shrunk during installation.
7.
Connect ABS warning light (figure 11, item 1) black wire (figure 11, item 4) to 36 in. (91 cm) blue wire
(figure 11, item 6) from CB#3 with new wire connector (figure 11, item 5).
8.
Route 76 in. (193 cm) blue wire (figure 11, item 2) from ABS ECU harness to test switch
(figure 11, item 17), and connect blue wire (figure 11, item 2) and ABS warning light black wire
(figure 11, item 3) to test switch terminal (figure 11, item 16) with star washer (figure 11, item 8) and
screw (figure 11, item 7).
9.
Connect 8 in. (203 mm) black wire (figure 11, item 13) to ABS test switch terminal (figure 11, item 15)
with star washer (figure 11, item 10) and screw (figure 11, item 9).
10.
Connect opposite end of 8 in. (203 mm) black wire (figure 11, item 13) to heater control box mounting
stud (figure 11, item 14) with star washer (figure 11, item 12) and nut (figure 11, item 11).
Figure 11. Connecting ABS Warning Light and Test Switch.