TM-9-2330-342-23-P

PALLETIZED LOAD SYSTEM TRAILER (PLST) M1076 A1

TECHNICAL MANUAL; FIELD MANUAL

OCTOBER 2012

  TM-9-2330-342-23-P - Page 323 of 1348

STEP 2
Does test equipment pass offset test?
WARNING
Be sure to wear the proper eye protection when working on or around pressurized air systems
if not injury or death could result.
1.
Pull out flatrack locking valve. Refer to TM 9-2330-342-10 (WP
0190).
2.
Drain trailer air system. Refer to TM 9-2330-342-10 (WP
0190).
3.
Disconnect air hose 2080 from flatrack locking valve.
4.
Connect air hose 2080 to TK pressure transducer (blue stripe).
TRANSDUCER
AIR LINE
2078
AIR LINE
2080
FLATRACK
LOCKING
VALVE
Figure 2.
Flatrack Locking Valve and Air Lines 2078 and 2080.
5.
Connect TK pressure test cable to MSD/ICE test equipment (WP
0004) and to TK pressure transducer (blue
stripe).
6.
Perform ICE Offset Test 50.
CONDITION/INDICATION
Does test equipment pass offset test?
DECISION
Yes - Go to (Step 3 - Does pressure holdback valve supply minimum of 65 to 70 psi (443-483 kPa) to air
chambers?).
No - Test equipment failed offset. Contact your Supervisor.
TM 9-2330-342-23&P
0030
0030-3


Back to Top