TM-9-2330-342-23-P

PALLETIZED LOAD SYSTEM TRAILER (PLST) M1076 A1

TECHNICAL MANUAL; FIELD MANUAL

OCTOBER 2012

  TM-9-2330-342-23-P - Page 504 of 1348

22-PIN CONNECTOR REPAIR - Continued
2
2
1
Figure 31.
22-Pin Connector Assembly.
NOTE
Perform Step (6) only if cab connector was removed.
6.
Install cab connector (Figure 32, Item 2) on cab (Figure 32, Item 3) with two screws (Figure 32, Item 1) and
locknuts (Figure 32, Item 4).
2
3
5
4
5
6
1
Figure 32.
22-Pin Connector Assembly.
7.
Install harness connector (Figure 32, Item 6) on cab connector (Figure 32, Item 2) with screw (Figure 32, Item
5).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Connect intervehicular power cable (TM 9-2330-342-10). (WP
0190)
2.
Remove wheel chocks (TM 9-2330-342-10). (WP
0190)
END OF TASK
END OF WORK PACKAGE
TM 9-2330-342-23&P
0055
0055-20


Back to Top