TM 9-2350-260-20-1-3
MASTER RELAY REPLACEMENT (Sheet 3 of 3)
INSTALLATION:
1.
Traverse turret to expose master relay.
Position master relay (A) into plate (B).
2.
Using socket, install two bolts (C) four new lockwashers (D), and two nuts (E) to hold master relay (A) to bracket (F).
NOTE
If your tank has protection device (G), continue with steps 3 through 8.
If your tank
does not have protection device (G), skip step 3 and continue with steps 4 through
8.
3.
Using 3/4 inch wrench, install protection device (G) to master relay (A).
4.
Using 7/8 inch wrench, install connector (H) to protection device (G).
5.
Using spanner wrench, install connector (J) to master relay (A).
6.
Using spanner wrench, install connector (K) to master relay (A).
7.
Connect three battery ground straps (page 10-294).
End of Task
TA147205
10-173