TM-9-2350-260-20-1-3

TANK, COMBAT, FULL TRACKED 105-MM GUN, M60 2350-00-678-5773 (HULL)

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE VOLUME 3 OF 4 CHAPTERS 10 THRU 15

  TM-9-2350-260-20-1-3 - Page 433 of 783

TM 9-2350-260-20-1-3
SHIFT LINKAGE ADJUSTMENT (Sheet 1 of 20)
TOOLS:
9/16 in.
socket with 1/2 in.
drive
7/16 in.
socket with 1/2 in.
drive
Ratchet with 1/2 in.
drive
9/16 in.
combination box and open end wrench (2 required)
Torque wrench with 1/2 in.
drive (0-175 lb-ft) (0-237 N
m)
7/16 in.
combination box and open end wrench
6 in.
rule
SUPPLIES:
Locating pin (1/8 in.
diameter by 2-1/2 in.
long copper rod)
Wire (0.06 in.
diameter by 2 in.
long) (Item 60, Appendix D)
REFERENCE:
TM 9-2350-260-10
PRELIMINARY PROCEDURES:Block tracks (TM 9-2350-260-10)
Remove transmission shroud (page 9-20)
Remove top deck (page 16-20)
Go on to Sheet 2
TA146556
11-2


Back to Top