TM 9-2350-260-20-1-3
SHIFT LINKAGE ADJUSTMENT (Sheet 5 of 20)
19. Using 9/16 inch wrench, install screw (S) through
link (V) and shifting rod bearing end (U).
20. Using 9/16 inch wrench, tighten jamnuts (Q) and (R).
21. Remove locating pin from alignment hole (P).
22. Using 9/16 inch socket and torque wrench, tighten
screw (S) to 15-20 lb-ft (20-27 N
•
m) and go to step
43.
23. Using 9/16 inch wrench, adjust shifting rod bearing
end (U) clockwise until shifting rod (T) is past hole
(W).
24. Using 9/16 inch wrench, remove screw (Y).
25. Using 9/16 inch wrench, install screw (S) through
link (V) and shifting rod bearing end (U).
26. Using 9/16 inch wrench, tighten jamnut (Q).
27. Using 9/16 inch socket and torque wrench, tighten
screw (S) to 15-20 lb-ft (20-27 N
•
m).
Go on to Sheet 6
TA146560
11-6