TM 9-2350-260-20-1-3
SHIFT LINKAGE ADJUSTMENT (Sheet 11 of 20)
68. Using 9/16 inch wrench, adjust shifting rod baring
end (AG) by turning clockwise or counterclockwise
until crew (AF) will drop freely through clevis (AH)
and shifting rod bearing end (AG).
69. Using 9/16 inch wrench, install screw (AF).
70. Using 9/16 inch wrench, tighten jamnut (AD).
71. Remove locating pin from alignment hole (AC).
72. Using 9/16 inch socket and torque wrench, tighten
screw (A) to 15-20 lb-ft (20-27 N
•
m).
73. Go to right rear of tank and try to insert locating pin into alignment hole (C) and through clevis (AB).
If locating pin can
be inserted, shift linkage is in adjustment.
Remove locating pin and go to step 129.
If locating pin cannot be inserted,
go on step 74.
74. Remove powerplant (page 5-1).
Go on to Sheet 12
TA146566
11-12