TM-9-2350-260-20-1-3

TANK, COMBAT, FULL TRACKED 105-MM GUN, M60 2350-00-678-5773 (HULL)

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE VOLUME 3 OF 4 CHAPTERS 10 THRU 15

  TM-9-2350-260-20-1-3 - Page 449 of 783

TM 9-2350-260-20-1-3
SHIFT LINKAGE ADJUSTMENT (Sheet 17 of 20)
127. Install 2A powerplant (page 5-14) or 2D powerplant
(page 5-40).
128. At top of transmission, try to insert locating pin in
alignment hole (C).
If locating pin can be inserted,
go on to step 129.
If locating pin cannot be
inserted, go to step 130.
RIGHT REAR OF TANK
TOP OF TRANSMISSION
129. At top of transmission, check position of shifting
position indicator (D).
If shifting position indicator
(D) is pointing to most forward dot (E), linkage is in
adjustment.
Go to step 160.
If shifting position
indicator (D) is not pointing to most forward dot (E),
go on to step 13.
130. Using 9/16 inch wrench, loosen jamnuts (BN) and
(BP).
131. Using 9/16 inch wrench, remove screw (F) (if not removed in step 4).
132. Using hands move shifting position indicator (D) to most forward dot (E).
133. Insert locating pin in alignment hole (C) (If not inserted in step 128).
NOTE
It may be necessary to move shifting position indicator (D) to most rear dot to
adjust shifting rod bearing end (G) and then back to most forward dot (E) to check
adjustment in step 134.
134. Using 9/16 inch wrench, adjust shifting rod bearing end (G) by turning clockwise or counterclockwise until screw (F)
will drop freely through shifting rod bearing end (G) and clevis (H).
Go on to Sheet 18
TA146572
11-18


Back to Top