TM 9-2350-260-20-1-3
SHIFT LINKAGE ADJUSTMENT (Sheet 18 of 20)
135.
Using small diameter wire, check to see if shifting
rod (BQ) is past holes (BR) and (BS).
If shifting
rod (BQ) is past holes (BR) and (BS), do steps
136 thru 139.
If shifting rod (BQ) is not past hole
(BR), do steps 140 through 149.
If shifting rod
(BQ) is not past hole (BS), go on to step 150.
TOP OF TRANSMISSION
136.
Using 9/16 inch wrench, install screw (F) through
clevis (H) and shifting rod bearing end (G).
137.
Using 9/16 inch wrench, tighten jamnuts (BT) and
(BU).
138.
Remove locating pin from alinement hole (C).
139.
Using 9/16 inch socket and torque wrench, tighten
screw (F) to 15-20 lb-ft (20-27 N
•
m) and go to step
160.
140.
Using 9/16 inch wrench, adjust shifting rod bearing
end (G) by turning clockwise until shifting rod (BQ)
is past hole (BR).
141.
Using 9/16 inch wrench, remove screw (BV) and remove shifting rod bearing end (BW) from clevis (BX).
142.
Using 9/16 inch wrench, install screw (F) through clevis (H) and shifting rod bearing end (G).
143.
Using 9/16 inch wrench, tighten jamnut (B).
144.
Using 9/16 inch socket and torque wrench, tighten screw (F) to 15-20 lb-ft (20-27 N
•
m).
Go on to Sheet 19
TA146573
11-19