TM 9-2350-261-20-2
REPLACE GENERATOR AND ADJUSTMENT LINKAGE (200 AMP
GENERATOR ONLY) — Continued
0228 00
15. Tighten jam nut (8) on turnbuckle (7). Tighten two nuts (9) on screws (10) that secure generator (6) to generator
mounting bracket (4).
16. Connect cable (11) to generator (6).
17. Install ground lead (12) on generator (6). Secure with new lockwasher (13) and nut (14).
18. Install starter ground lead (15) and generator ground lead (12) on bracket (16). Secure with two washers (17), screw
(18), and new locknut (19).
FOLLOW-THROUGH STEPS
1.
Connect battery ground lead (WP 0294 00).
2.
Install fan drive belts (WP 0211 00).
3.
Install generator drive belts (WP 0234 00).
4.
While engine is running, check to be sure that generator and linkage are installed correctly.
5.
Check generator output for proper operation.
6.
Stop/shutdown engine (see your -10).
7.
Install power plant rear access panels and support (WP 0433 00).
END OF TASK
0228 00-6


Back to Top