TM-9-2350-261-20-2

CARRIER, M113A2, M577A2, M1064, M1068, M1059 AND M901A1

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL - VOLUME 2 OF 4

  TM-9-2350-261-20-2 - Page 640 of 1008

TM 9-2350-261-20-2
REPLACE RIGHT FINAL DRIVE SHAFT — Continued
0349 00
INSTALLATION
1.
Install yoke (4) in final drive (5).
CAUTION
Final drive or differential damage could result if universal joints and shaft are not aligned right.
Align and tighten all screws to correct torque.
NOTE
Screws and washers must be clean, dry, and free of lubricants and paint. Washers must be
5/32-inch (4 mm) hardened flat steel only.
FOLLOW-THROUGH STEPS
1.
Close power plant front access door (see your -10).
2.
Raisetrimvane(seeyour-10)
.
3.
Road test carrier (WP 0120 00) to check right final drive shaft.
4.
Stop/shutdown engine (see your -10).
END OF TASK
0349 00-2
2.
Secure adapter (10) to differential (11) with four new locknuts (9). TIGHTEN NUTS TO 75-80 LB-FT (102-108 N·M)
TORQUE. Use torque wrench.
3.
Position propeller shaft (6) in vise and install universal joints (3) with eight new screws (7) and washers (8). TIGHTEN
SCREWS TO 35-40 LB-FT (47-54 N·M) TORQUE. Use torque wrench and adapter. LOOSEN SCREWS AND
TIGHTEN AGAIN TO 35-40 LB-FT (47-54 N·M) TORQUE.
4.
Position propeller shaft (6) with universal joints (3) and secure to differential adapter (10) and final drive yoke (4) with
eight new screws (1) and washers (2). TIGHTEN SCREWS TO 35-40 LB-FT (47-54 N·M) TORQUE. Use torque
wrench and adapter. LOOSEN SCREWS AND TIGHTEN AGAIN TO 35-40 LB-FT (47-54 N·M) TORQUE.