TM 9-2350-261-20-2
REPLACE HAND THROTTLE — Continued
0402 00
INSTALLATION
1.
Install new grommet (1) in driver’s floor plate.
2.
Feed cable assembly (2) through mounting hole in driver’s compartment bulkhead to power plant front access door
opening.
3.
Slide washer (3) and nut (4) on cable assembly (2). Secure to driver’s compartment bulkhead.
4.
Install cable assembly (2) on two weldnuts (5). Secure with two washers (6), screws (7), and four clamps (8).
5.
Install cable assembly (2) on weldnut (9). Secure with two straps (10), screws (11), new lockwasher (12), and new
locknut (13).
6.
Install pin (14) on accelerator pedal assembly (15). Secure with washer (16) and new cotter pin (17).
7.
Install cable assembly (2) on pin (14). Secure with collar (18) and set screw (19).
ADJUSTMENT
1.
Loosen set screw (19). Push control cable assembly (2) handle full forward.
2.
Place pedal assembly (15) in full closed throttle position (see your -10). Tighten set screw (19) in collar (18).
FOLLOW-THROUGH STEPS
1.
Start engine (see your -10). Using the pedal, check that hand throttle operates properly.
2.
Stop/shutdown engine (see your -10)
3.
Close power plant front access door (see your -10).
4.
Raisetrimvane(seeyour-10)
.
5.
Install driver’s power plant access panel (see your -10).
END OFTASK
0402 00-3/4 blank