REMOVAL
1.
Attach beam-type sling (Figure 1, Item 1) to lifting brackets (Figure 1, Item 2) and support engine with
lifting device.
2.
Remove two screws (Figure 1, Item 16), two nuts (Figure 1, Item 10), two lockwashers (Figure 1, Item 11),
and four flat washers (Figure 1, Item 12) connecting trunnion assembly (Figure 1, Item 15) to forward
container support (Figure 1, Item 14). Store screws, washers, and nuts in mailbag (Figure 1, Item 9) in lower
half of container (Figure 1, Item 13). Discard lockwashers.
3.
Remove four screws (Figure 1, Item 8), four nuts (Figure 1, Item 4), four lockwashers (Figure 1, Item 5), and
four flat washers (Figure 1, Item 6) connecting rear support (Figure 1, Item 7) to two container mounting
brackets (Figure 1, Item 3). Discard lockwashers.
WARNING
Never crawl under equipment when performing maintenance unless equipment is securely
blocked. Keep clear of equipment when it is being raised or lowered. Do not allow heavy
components to swing while suspended by lifting device. Exercise caution when working
near a cable or a chain under tension as equipment may drop or shift. Failure to comply
may result in injury to personnel.
4.
Remove engine from lower half of container (Figure 1, Item 13).
16
12
4
5
6
1
9
14
15
13
12
11
10
8
3
7
2
MAINT_088
Figure 1.
Engine Removal from Lower Half of Container.
TM 9-2815-205-24
0033
0033-2