TB-9-2320-280-35-15

TECHNICAL BULLETIN

INSTALLATION INSTRUCTIONS FOR RETRANSMISSION VEHICLE WITH AMTECH TOP FOR AN/VRC-92F, AN/UYK-128 (V)4, RT-1812, AN/VSQ-2 (V), AB-1386/U, DAGR, AN/PSN-11

SEPTEMBER 2006

  TB-9-2320-280-35-15 - Page 82 of 168

5-58
TB 9-2320-280-35-15
Figure 5-67.
Section XXVII. POWER ENTRY BOX INSTALLATION
27-1.
Locate, mark, and drill one 0.188-in. diameter hole (4) in right wheelhouse (5).
27-2.
Using power entry box (7) as template, locate, mark, and drill three 0.188-in. diameter holes (3) in
right wheelhouse (5).
27-3.
Install power entry box (7) on right wheelhouse (5) with four capscrews (1), eight washers (2), and
four locknuts (6).
1
2
7
4
2
6
5
~
1. SCREW – MS35207-265 – QTY. 4
2. WASHER – MS27183-8 – QTY. 8
6. NUT – MS35650-302 – QTY. 4
7. POWER ENTRY BOX – 03A0108D – QTY. 1
3
5.75
24.31


Back to Top