TB-9-2320-280-35-15

TECHNICAL BULLETIN

INSTALLATION INSTRUCTIONS FOR RETRANSMISSION VEHICLE WITH AMTECH TOP FOR AN/VRC-92F, AN/UYK-128 (V)4, RT-1812, AN/VSQ-2 (V), AB-1386/U, DAGR, AN/PSN-11

SEPTEMBER 2006

  TB-9-2320-280-35-15 - Page 90 of 168

5-66
TB 9-2320-280-35-15
Figure 5-78.
12
12
13
0.50
30-9.
Scribe line around C-beam (13) to locate hole position (12) on underside of C-beam (13).
NOTE
• C-beam is angled and bolt length will be lost if hole is drilled too
far forward.
• Center holes vertically on C-beam.
30-10.
Drill two 0.343-in. diameter holes (12) through C-beam (13).
Figure 5-77.
12
13
4
0.50
12


Back to Top